← Sottava, jobs the hour they open
Posted 2 mo agoFirst seen 1 mo ago
Construction Scheduler - Mobile Construction
Posted by xAI on 18 September 2026, 61 days ago. Still on their Greenhouse board when we checked 37 min ago. Half of xAI's roles come down within 75 days.
What the posting is about
Develop and maintain construction schedules using CPM, update them with real progress, flag risks, and explain schedule impacts. Collaborate with field, subcontractors, and leadership. Relocate with mobile construction team.
Your experience, ready for this role
Answer a few questions about your real work. Review the additions and download your CV.
Strengthen my CVRead out of the posting
Levelmid
Experience asked4+ years
EmploymentFull time
LocationSouthaven, MS, Memphis, TN
Work arrangementOffice based
Visa sponsorshipNot stated
SalaryNot extracted, check the posting
Posted2026-09-18
Found viagreenhouse, direct from their system
We saw it 22 days after it went up.
The posting, as the company wrote it
SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today, SpaceX is actively developing the technologies to make this possible, with the ultimate goal of making life multiplanetary and expanding consciousness to the stars.
SpaceXSI is building Super Intelligence to help humanity understand the universe. Our teams are building the full Super Intelligence stack: from our Colossus supercomputers, to Grok models, to our suite of applications, including Grok Bot, Grok Build, Grok Imagine, Grok Voice, and X. We're creating a powerful flywheel where more compute trains better models, better models power more useful products, and what we learn from people using those products shapes what we build next.
CONSTRUCTION SCHEDULER
Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.
Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.
The team goes where the next site is — a pad, a factory, a supercluster, whatever has to exist before the rest of the company can move. Right now that is Memphis, TN / Southaven, MS. Then it is the next one. Per diem comes with the assignment.
RESPONSIBILITIES:
Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly)
Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates)
Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did
Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew
Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios
Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones
Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates
Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals
Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed
Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable
Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model
Visit the site regularly. A scheduler who never walks the job will be wrong
Relocate with the mobile team as assignments change, starting in Memphis, TN / Southaven, MS
BASIC QUALIFICATIONS:
4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor)
4+ years of experience using Smartsheet, MS Project, or other project management tool
4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
PREFERRED SKILLS AND EXPERIENCE:
Comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints)
Bachelor’s in construction management, civil engineering, or a related field; OR equivalent field experience
PSP (AACE), PMI-SP, PMP, CCM, or similar credential
Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
Forensic delay analysis, time-impact analysis, and claims support
Cost/resource loading, earned value, and integration with cost systems
Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus
Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud
ADDITIONAL REQUIREMENTS:
Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence
This role is part of the mobile construction team and you will be expected to travel to the assigned work project. Current work assignment is based in Memphis, TN / Southaven, MS. Future assignments will require relocation to other U.S. construction sites. Per diem is provided while on assignment
Must be comfortable working in a fully onsite environment
Must be willing to work any shift, extended hours and/or holidays during assigned work assignment. This includes rotating shifts, nights and/or weekends. If you are assigned night shift, you will receive a shift differential for hours worked during off nominal hours
Must be willing to work in industrial environments with exposure to noise, heavy equipment, excavations, and energized electrical systems. Must be able to lift 25 lbs+ unassisted and perform physically demanding tasks outdoors/indoors, tight conditions and/or at heights
SpaceXSI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice .
Why this page exists
We read companies’ own hiring systems every hour, 2,106 of them, and show a job the hour it opens instead of when a job board gets around to indexing it. We saw it 22 days after it went up.
The feed is free. No card, no trial to expire.
A free account and your résumé first, no card